Manderwood

Timber Engineering Ltd.

Case Studies.

This is an ongoing project for The Mead Group.
Manderwood Timber Engineering was approached to
engineer, design, and manufacture a floor system for
approximately one third of the building to create a first
floor within the structure. Using the Easi-Joist Metal Web
floor system, this allowed for a simple yet very economic
solution to create a floor of this size. The final engineered
design was produced from Steel layout drawings and
dimensions checked on site. However, to allow for
dimensional differences, the Easi-Joists have been
designed to allow trimming on site if needed. The
advantages of the Easi-Joist floor system enabled
this particular project to span between the steels
without the need for additional internal load-bearing
supports. This in turn required the fabrication of 235 joists
from our depot in Highbridge, Somerset.

Click an image to view or view slideslow.

More photos will be added showing fabrication, erection,
and completion.

 Welcome...........

Registered and Head Office

Unit 5
Great Honeyborough
Neyland
Milford Haven
Pembrokeshire
SA73 1SE

Company Reg.No.1339715

Tel:- (01646) 600621
Fax:- (01646) 600784
Email:- sales@manderwood.co.uk
How to find us

Unit 4 (Production Only)
Rutherglen Centre
Baglan
Port Talbot
West Glamorgan
SA12 7BR
Tel:- (01639) 821641
How to find us

Unit 9a
Commerce Way
Walrow Ind.Est.
Highbridge
Somerset
TA9 4AG
Tel:- (01278) 793808
Fax:- (01278) 793795
Email:- highbridge@manderwood.co.uk
How to find us

You are viewing the text version of this site.

To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.

Need help? check the requirements page.


Get Flash Player